Mast Step Wedge
By Helen Opie #904 "Molly Kool" (1es 1eo 1ea 31ar)
Mast step in place, awaiting finishing of reworked cuddy roof to be able to put the pipe sleeve through it. I am exceedingly happy about the 6" slice of 2x6 I hand-sawed to make a wedge to level the bottom for the mast to set vertical. Cutting through at angle from second direction, bit of shaving holding kerf open at bottom.

The two slices: amazed at how I couldn't even tell where the cuts from both directions met! Saving one half for PDR #2 (a flat-topped day sailer/easy hauler).